Skip to Main Content
Impossible Builds

The Team Stumbles Upon a Problem Inside the Building

Mark Morabito must conduct a floor-by-floor inspection of the building every day.

02/07/2018 | Rating TV-G

Impossible Builds

The Team Stumbles Upon a Problem Inside the Building

Clip: Episode 1 | 2m 38sVideo has Closed Captions

Mark Morabito must conduct a floor-by-floor inspection of the building every day.

The Scorpion Tower’s head of interiors, Mark Morabito, must conduct a floor-by-floor inspection of the building every day. However, due to the build’s unique curved design, no two floors are the same, and it’s during one of these inspections that Mark spots an alignment issue with the lights and sprinklers.

02/07/2018 | Rating TV-G

Problems playing video?   | Closed Captioning Feedback

Report a Problem

Before you submit an error, please consult our Video Help page.

Problems playing video?   | Closed Captioning Feedback

Report a Problem

Before you submit an error, please consult our Video Help page.

Buck Hoists Play an Essential Role in Building the Tower

Video has Closed Captions

Clip: Ep1 | 3m 5s | To transport materials the team uses two elevators known as buck hoists. (3m 5s)

Creating the Scorpion Tower’s Silky Aesthetic

Video has Closed Captions

Clip: Ep1 | 1m 24s | The exoskeleton of the Scorpion Tower is created using glass fiber reinforced concrete. (1m 24s)

Providing Support for PBS.org

Learn Moreabout PBS online sponsorship

Support for PBS provided by:

Sign in with Email

or

Continue with GoogleContinue with FacebookContinue with Apple

By creating an account, you acknowledge that PBS may share your information with our member stations and our respective service providers, and that you have read and understand the Privacy Policy and Terms of Use.

Are you sure you want to remove null from My List?